Actually, I have the sign for the end of the driveway done but will wait a bit more before installing since I'm supposed to have our new hotel license before advertising and I assume signage is advertising.
Still working on the big one but it will be OK. I just finished tonight one side of it. But, since each side is visible from each direction on the highway, I have to do the same thing on the next side. Sigh...
I finished painting #3 and it looks nice. Rusty has to lower the ceiling in the bathroom and then I have to finish that out, but that room is almost ready. #2 is the same. #4 is just getting a decor facelift now and will paint later since we have to install a new sink in the bath and that paint isn't terrible.
I worked in the casitas on Friday and feel pretty good about them. Not too much more to do in any of them. Just cleaning all the linens and freshening it all up.
So, we are getting there. #1 is my big painting job for this week.
We had the buildings pressured washed on Fri so this week also starts the painting outside. A couple more weeks and it will be a new place.
Sunday, August 28, 2016
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment